urban renewal

Renewal is a process within the framework of urban renewal that aims to change the nature of the proposed construction and transform old neighborhoods and complexes that were built with low construction quality, with low occupancy land utilization, into buildings adapted to the spirit of the time with a vision for the future in regards to the mix of apartments, the number of floors, to expand the construction areas and increase the number of units The housing, with an emphasis on the public space for the well-being of the tenants.

The process of changing and transforming old residential neighborhoods and adapting them to the future requires large financial resources, willingness and desire both on the part of the residents and on the part of the authorities to facilitate the planning bureaucratic process and above all to provide an entrepreneurial response to the feasibility of the project in the economic aspects.

   

  

The Building Evacuation Law authorized the state to declare a rehabilitation area or a rehabilitation building, to plan its rehabilitation and to direct the tenants to alternative housing in order to rebuild it.

The law authorized the state to grant entrepreneurs and contractors excess construction rights and tax benefits in order to incentivize them to carry out construction evacuation and urban renewal projects.

Construction evacuation and urban renewal projects require an in-depth preliminary examination in the planning aspect, the entrepreneurial viability and the willingness of the authorities to promote change in projects that require urban renewal.

Promotion of those projects of building clearance and urban renewal are often carried out by a thorough understanding of the need, change and the possibility to promote these projects from a statutory point of view relatively quickly in order to pass all the barriers until the project is approved and established.

The complexities of the issues arising in construction evacuation projects of this type require professional guidance by professionals who are engaged in the field and cover all aspects of the project, committee meetings and presentation of the project to both the professional level and the residents of the existing building.

If the project requires the eviction of the existing tenants, holding conferences in front of the housing committees to present the project by the architect in collaboration with the developer.

Preliminary tests for project programming both from an entrepreneurial point of view and from the point of view of the existing tenants:

 

  • conomic feasibility test.
  • Legal support.
  • Preparation of a report “0”
  • Planning flexibility and testing several alternatives.
  • Optimal planning to maximize entrepreneurial profit.